1) Regeneration gas: a combination of hydrogen and inert atmosphere glove box gas (hydrogen accounts for 5% -10%) 2) Amount: 40L fuel cylinder 10Mpa three) Regenerative gas tension: .05Mpa (the gasoline consumption per half hour in the condition of .05Mpa is that the cylinder tension drops by one.5Mpa. If it exceeds 1.5Mpa, the stress of the force regulator’s schedule will be lowered, if it is much less than 1.5Mpa Maximize the strain of the tension regulator plan) four) System: 3 hrs heating-three several hours heating and air flow-3 hrs vacuuming-one hour pumping-10 hours cooling 5) Techniques: ① Hook up the regeneration gas (check the pipeline for leaks immediately after relationship: immediately after connecting, open up the key valve of the force lessening valve to the highest, open the auxiliary meter to .1Mpa, flip off the principal valve, wait around 15 minutes, if the force of the auxiliary meter continues to be at .one Mpa remains unchanged, indicating no air leakage) ②Set the strain of the auxiliary gauge of the tension cutting down valve to .1Mpa (the stress throughout ventilation is about .06-.08MPa) ③ Shut the cycle and analyzer ④Turn on the vacuum pump ⑤ Start out regeneration ⑥ The new software ends at 20h (clear in advance of cleansing, h2o and oxygen index <200ppm). 6) Note: Do not cut off the power and gas during the regeneration process (especially the first 6 hours)! Some pressure reducing valves are not allowed, and the pressure needs to be adjusted appropriately to ensure continuous ventilation for 3 hours! 7) Observation: whether the regeneration gas flowmeter shows about 20L / min, otherwise adjust the pressure of the pressure reducing valve.
Be the first person to like this.